Havnelageret
Tunnelen som skal binde Sørenga og Havnelageret i Oslo sammen.
Detaljer
Hochhaus Neue Donau
135m high residential building
Detaljer
Police Headquarter
Renovation works on the surrounding sandstone cornices
Detaljer
Water power station
NAPLA special formwork from Hünnebeck
Detaljer
Ellipson
For this 62m high office building the Hünnebeck concept allows pouring and rebar works at the same time on various levels.
Detaljer
Tiefgarage
For many years the company Nassal has MANTO wall formwork and TOPEC slab formwork in use. For the ceiling of the underground car park the company purchased another 130 pieces of TOPEC large panels.
Detaljer
Dorotheenblöcke
Wall- and slabformwork for the parliamentary buildings round the "Reichstag"
Detaljer
Alsenblöcke
approx. 1,500 sqm of GF24 girder wall formwork for the huge slab of the "Paul-Löbe-Haus"
Detaljer
Airport - Arrival and departure terminal
For the civil works on the Dresden new Airport the formwork, shoring and scaffolding were delivered by Hünnebeck.
Detaljer
Gypsum treatment silo
MANTO frame panel formwork for an outer wall of 14,4 m height
Detaljer
Frankfurt Trade fair building, hall 3
The concrete surface of the new hall 3 completely equipped with Hünnebeck material
Detaljer
EA Generali - Tower
60m high office building. Systems in use: 670 sqm. KST table formwork, 790 sqm. MANTO wall formwork, 480 sqm. RASTO wall formwork and 135 rng.m folding scaffold.
Detaljer
Schloßkirche Wittenberg
Hünnebeck MODEX with its load nodes enabled the free-standing construction.
Detaljer
Frankfurter Tor
15,000 sqm of BOSTA 100 scaffold have been erected around the building and around the 78m high towers.
Detaljer
Nuclear fuel storage
Formwork of 28m high columns
Detaljer
Asker Station
New railway station in Asker (near Oslo) with formwork heights of up to 9m
Detaljer
Hoevringen Renseanlegg
Construction of nine circular water tanks with a height of up to 15m in a sewage treatment plant
Detaljer
Self climbing formwork in Polimilos / Greece
Detaljer
University Sorbonne
MODEX was used as façade scaffolding
Detaljer
Vodafone Park
Enthusiastic about the practicability of our TAKKO formwork
Detaljer
Berliner Tor
1.70 m office building equipped with Hünnebeck slab formwork, 11,000 steel props and 39 kilometre of H20 beams
Detaljer
Kranzler-Eck
2 office buildings with 9 and 16 floors
Detaljer
Burj Tower
For the construction of the world's tallest building, the nigh on 800 m tall Burj Dubai (= Dubai Tower), formwork technology engineered in Germany is in big demand.
Detaljer
Residential house in Duisburg Rahm
Takko cellar walls
Detaljer
Abutment of the Saale bridge in Halle Röpzig
ES 24 element formwork and ID15 frame towers
Detaljer
Rostock sewage treatment plant
Sewage treatment plant with 800 m² ES 24 element formwork, Manto, Rasto, Takko, Variomax and ID15
Detaljer
Administration new building of the Deutsche Bahn AG
100 tons of ID15 for the administration new building of the Deutsche Bahn.
Detaljer
Office building in Kadolzburg
An excellent fair-faced concrete surface reached through the use of TOPEC.
Detaljer
Town Town
Formwork strategy and provision of wall and slab formwork for the new district "Town Town"
Detaljer
Berlin Main Station (Lehrter Bahnhof)
Supply of wall and slab formwork for the construction of two office buildings
Detaljer
Frauenkirche
Provision of all the scaffolding materials during the eight-year reconstruction
Detaljer
CBX Tower
The CBX Tower, a 142 meter high building with 36 storeys
Detaljer
Golden Terrace
Polens største kjøpesenter og et av de største i Europa.
Detaljer
Residential house in Nürnberg-Katzwang
Detaljer
KOLUMBA new building of the archbishop diocese museum in Cologne
Weather protection hall with about 5,000 m² façade scaffolding BOSTA 100
Detaljer
Flood basin
RONDA circular formwork for the circular bassin with a diameter of 25m and a height of 11m
Detaljer
Underground parking
with TOPEC slab formwork and polygonal adjustments for the arches in the ceilings
Detaljer
Hypo-Haus Ost
7-storey office building: Alu Top, MANTO and RONDA in use
Detaljer
Unterföhring-Park
office building of the re-insurance company "Bayerische Rückversicherung": Alu-Top, H20, R24, MANTO, floor tables and folding scaffolds.
Detaljer
Swiss Life
The office building was shuttered with MANTO, column formwork, support frames and H20.
Detaljer
Expo Hannover
For the Greek pavilion Takko in use.
Detaljer
Ares Tower
TOPEC, R24 SCF and MANTO in use
Detaljer
Bømlabrua
Begge de to 102 meter høye bropilarene ble støpt ved hjelp av hydraulisk selvklatrende form. På hvert brokar ble det utført 48 støp på opp til 4,9 meters høyde.
Detaljer
Viaduc des Vaux
Self climbing system SCF combined with R24 wall formwork.
Detaljer
Danube bridge
NAPLA special formwork for elaborating parabolic form.
Detaljer
Boxberg Power Plant
The formwork concept of the power plant was developed by Hünnebeck together with the Strabag AG.
Detaljer
Schloss Moritzburg
Work and safety scaffold with a maximum height of 24 meters for the redevelopment of the south-west tower of Castle Moritzburg.
Detaljer
Moscow Metro
In coorperation with SMU Engeocom, Hünnebeck developed a customized mobile tunnel carriage.
Detaljer
Residential Park Ville Verdi
Development of a formwork solution of standard MANTO and VARIOMAX rental equipment.
Detaljer
Ernst-August Shopping Gallery Hannover
Hünnebeck developed the formwork concept using standard rental materials and custom-built solutions.
Detaljer
Sport and Entertainment Arena Lodz
The foundation, platforms and utility shafts were erected with Hünnebeck formwork solutions.
Detaljer
Tour T1
A large project for the Hünnebeck SCF system (self climbing formwork), which can withstand the load of 15 tonnes per bracket. Consequently, it increased the building's height by 5 meters per week.
Detaljer
Shopping Center Sarajevo
Roundabout 3,600 m² of the unsupported TOPEC formwork was used in the construction of the shopping center.
Detaljer
The Eye Darmstadt
The Hünnebeck subsidiary in Darmstadt was in charge of the delivery of large amounts of formwork materials.
Detaljer
Forli Waste Incineration Plant
For the construction of the steel-concrete pillars, Hünnebeck developed and delivered a pre-assembled formwork, made up of a combination of H 20-timber beams and steel girders.
Detaljer
Power Plant Premnitz
Hünnebeck developed a sophisticated falsework and formwork system for the construction of the plant.
Detaljer
Rapid-Transit Railway Brescia
Hünnebeck Italia developed a cost and time-efficient formwork solution for the railway.
Detaljer
Waste Incineration Plant Lüttich
Hünnebeck supplied rental material worth 2.4 million Euros.
Detaljer
Arena Plaza Budapest
Hünnebeck supplied the complete scaffolding materials for Hungary's largest shopping-center.
Detaljer
Tour Granite
Because of the SCF's high flexibility, the system could be specifically adapted to any structure of the facade and provided an extremely safe working platform at any time during the application of different special formwork.
Detaljer
Forum Duisburg
Hünnebeck developed a detailed formwork solution for the complete shopping-center.
Detaljer
Sea Towers
On the construction site of the currently tallest building outside of Warsaw, 30,000 m² of Hünnebeck scaffolding solutions were applied.
Detaljer